Milestones Building and Design Logo   

Milestones Building & Design

Industrial Fabric Covered Buildings

 

Home

 

 

City of Lacey, WA Public Works

MBD Buildings Provides the City of Lacey Public Works

with a Waste Management Fabric Covered Building Solution

Customer:     City of Lacy Public Works

Location:       Lacey, WA

Application:  Fabric Covered Building Waste Management Project

The City of Lacey decant facility is used to separate the suspended silts and fine debris that are generated when storm water pipes are cleaned.  The use of the fabric covered building keeps storm water runoff from being contaminated by the sediment piles, and prevents the incorporation of debris back into the storm water collection system.  Milestones Building and Design helped the City of Lacey design and implement a fabric covered building structure that would be comfortable to workers, and that would have enough overhead clearance to accommodate the different kinds of machinery that are utilized during their operations. 

 

 

 

Home - About - Privacy Policy - Contact

Milestones Building and Design, Bellingham, WA 98226

Copyright © 2021 Milestones Building & Design, all rights reserved.